Teerth Gopicon IPO Review - Issue Date, Price, GMP, Subscription, Allotment, Lot Size, and Details

About Teerth Gopicon Limited

An engineering construction and development company, incorporated in Ahmedabad as a private limited company on October 10, 2019. The company is engaged primarily in the construction of roads, sewerage work and water distribution work in the Madhya Pradesh. Apart from this company have also worked as sub-contractor and constructed residential tower in the city of Indore.

Scope of services includes detailed engineering of the project, procurement of construction materials, plant and machinery, construction and execution of the project and its operation and maintenance in accordance with the contractual provisions. Their manpower, resources and fleet of machinery and equipment, together with it’s engineering capabilities, enables them to execute a large number of projects simultaneously.

Company has executed wide range of civil engineering projects like building construction work, water supply, pipeline, sewerage network, sewerage treatment plant, nalla tapping work, Re-use network, Over Head Tanks, GSR, Road work, Rejuvenation of Lake etc

The business of the company is concentrated in the State of Madhya Pradesh and mainly in city of Indore, Chhattarpur, Sagar, Dindori, Jabalpur and Ujjain. The various clients of the Company are Indore Smart City Development Limited, Indore Municipal Corporation, Ujjain Smart City Limited, Ujjain Municipal Corporation and Madhya Pradesh Jal Nigam Maryadit.

In the Financial Year 2020-21, 2021-22 and 2022-23 the company has concentrated in Sewage Project and Road Construction Project. After the FY 2023 the company has concentrated in the Water Distribution projects and got the good water distribution projects from the Local Authorities and Government. This changed the financial position of the Company on account of execution of water distribution work which was awarded to the Company in the month of February 2023 and The Water supply system projects awarded to the Company has higher profit margin and the company is earlier mover in the water supply system project. Out of the total revenue from operation water distribution work has 90.97% contribution.

Order book in terms of value of contracts, including subcontracting assignments, was Rs. 114034.00 lakhs as on 31st Jan’24.

Among the 10 projects

  • Water supply system has 5 projects worth Rs. 103489.00 lakhs.
  • Rejuvenation of Rudrasagar Lake is worth Rs.1458.00 lakhs.
  • Surface Parking, office Building has 1 project worth Rs. 906 lakhs
  • Sewage Treatment has 1 project worth Rs.2270.00 lakhs.
  • Real Estate Development has 1 project worth Rs. 2571.00 lakhs.
  • Road development has 1 project worth Rs.3340.00 lakhs.

Infrastructure sector is a key driver for the Indian economy. The sector is highly responsible for propelling India’s overall development and enjoys intense focus from Government for initiating policies that would ensure time-bound creation of world class infrastructure in the country. The infrastructure sector includes power, bridges, dams, roads, and urban infrastructure development.

In other words, the infrastructure sector acts as a catalyst for India’s economic growth as it drives the growth of the allied sectors like townships, housing, built-up infrastructure, and construction development projects. To meet India’s aim of reaching a US$ 5 trillion economy by 2025, infrastructure development is the need of the hour.

The government has launched the National Infrastructure Pipeline (NIP) combined with other initiatives such as ‘Make in India’ and the production-linked incentives (PLI) scheme to augment the growth of infrastructure sector. Historically, more than 80% of the country's infrastructure spending has gone toward funding for transportation, electricity, and water& irrigation. While these sectors still remain the key focus, the government has also started to focus on other sectors as India's environment and demographics are evolving. There is a compelling need for enhanced and improved delivery across the whole infrastructure spectrum, from housing provision to water and sanitation services to digital and transportation demands, which will assure economic growth, increase quality of life, and boost sectoral competitiveness.

Finance minister Nirmala Sitharaman's Budget for 2023-24 underlines sustained focus on the northeast for "inclusive development" as one of the seven priorities, which act as the 'Saptarishi' guiding the government "through the Amrit Kaal”. Under Budget 2023-24, capital investment outlay for infrastructure is being increased by 33% to Rs.10 lakh crore (US$ 122 billion), which would be 3.3 per cent of GDP and almost three times the outlay in 2019-20.

Under Budget 2023-24, Infrastructure Finance Secretariat is being established to enhance opportunities for private investment in infrastructure that will assist all stakeholders for more private investment in infrastructure, including railways, roads, urban infrastructure, and power. In June 2022, the Minister of Road Transport and Highways, opened 15 national highway projects worth Rs. 13,585 crores (US$1.7 billion) in Patna and Hajipur, Bihar.

Risk related to the issue

Business is concentrated in Madhya Pradesh: Company is primarily dependent on projects undertaken or awarded in the state of Madhya Pradesh. The company rely 100% on the State government, Local Authority and it’s undertaking, deriving majority of its revenue from contracts with a limited number of government authorities and other entities any adverse development in Madhya Pradesh may affect the operations impacting on business, financial condition and operations.

High Competition and Labor intensive: The company operates in highly competitive environment. In the open Bid/Tender, the process of awarding contracts / projects, clients generally specify pre-qualification criteria. The company expects to face competition from large domestic infrastructure development companies, which are well placed to fulfil the pre-qualification criteria.

Limited number of clients: Currently, 100% of the revenue of the company comes from 5 clients. This makes the company accept onerous contractual terms in contracts for projects awarded by clients.

Own large fleet of Machineries and equipment: The company owns large fleet and machinery because during the peak season it is difficult to get the desired machine at desired price for the required time to complete the contract on time. To overcome such situation, they have started investing in the plant and machineries and for the period ended on January 31, 2024 & have acquired machineries worth Rs. 704.63 lacs and vehicles of Rs. 125.88lacs.

Engage sub-contractors and other agencies for execution: Company rely on third parties for the implementation of projects where they have entered into arrangements with them for the supply of labour, equipment and raw material. Accordingly, the timing and quality of our infrastructure projects also depends on the availability and the skill of such sub-contractors.

High working capital requirements: The company needs to manage significant amount of working capital, If they are not able to manage the same they may not be able to bid for new projects and it will adversely affect the growth, profitability and business.

Require certain registrations: Business operations requires to obtain and renew certain approvals, licenses, registration and permits from time to time from the different regulatory authorities failure can comply with applicable conditions.

Services

The GST registration process at FinanceSaathi is quick, transparent, and end-to-end online:

Step Process Timeline
1 Consultation & Eligibility Check – Our experts assess your business and required documents. 1 Day
2 Document Collection & Preparation – You share scanned copies; we prepare the application. 1–2 Days
3 Online Application Submission – Filing GST REG-01 on GST portal. 1 Day
4 ARN Generation & Verification – Acknowledgment number generated and verified. 1 Day
5 GST Officer Review – Department may seek clarification if required. 2–3 Days
6 GSTIN Allotment & Certificate Issued – Once approved, you receive your GST registration certificate via email. 3–5 Days Total

Estimated Total Duration: 3–5 Working Days

The Income Tax Return filing process at Finance Saathi is simple and completely online:

Step Process Timeline
1 Consultation – Our experts understand your income sources and tax requirements. Same Day
2 Document Collection – Required documents and income details collected. Same Day
3 Tax Calculation – Accurate computation of income, deductions, and tax liability. 1 Day
4 ITR Preparation – Preparation of the appropriate ITR form. 1 Day
5 Client Approval – Return shared with client for confirmation. Same Day
6 ITR Filing & Acknowledgment – Return filed on Income Tax portal and acknowledgment shared. Same Day

Estimated Total Duration: 1–2 Working Days

The GST return filing process at Finance Saathi is simple, structured, and fully online:

Step Process Timeline
1 Consultation & Return Type Identification – We identify applicable returns based on your business. Same Day
2 Document Collection – You share invoices and required details digitally. 1–2 Days
3 Data Review & ITC Reconciliation – Our experts verify data and reconcile ITC. 1 Day
4 GST Return Preparation – Accurate preparation of GSTR-1 / GSTR-3B / other returns. 1 Day
5 Client Confirmation – Draft shared for approval before filing. Same Day
6 GST Return Filing – Returns filed on the GST portal and acknowledgment shared. Same Day

Estimated Turnaround Time: 2–4 Working Days (per return period)

The business tax filing process at Finance Saathi is simple and fully online:

Step Process Timeline
1 Consultation – Our experts understand your business structure and tax requirements. Same Day
2 Document Collection – Financial records and tax documents collected. 1–2 Days
3 Financial Review – Analysis of income, expenses, and deductions. 1 Day
4 Tax Calculation & Return Preparation – Accurate computation and preparation of ITR form. 1 Day
5 Client Approval – Draft return shared with client for confirmation. Same Day
6 Return Filing – Business tax return filed on the Income Tax portal and acknowledgment shared. Same Day

Estimated Total Duration: 2–4 Working Days

The Udyam registration process at Finance Saathi is quick and completely online:

Step Process Timeline
1 Consultation – Our experts understand your business details and eligibility. Same Day
2 Document Collection – Required business and identity details collected. Same Day
3 Application Preparation – MSME registration application prepared on Udyam portal. Same Day
4 Online Submission – Application submitted on the official Udyam registration portal. Same Day
5 Verification & Processing – Government system verifies Aadhaar and PAN details. Same Day
6 Udyam Certificate Issued – MSME registration certificate generated and shared. Within 1–2 Days

Estimated Total Duration: 1–2 Working Days

The GST return filing process at Finance Saathi is simple, structured, and fully online:

Step Process Timeline
1 Consultation & Return Type Identification – We identify applicable returns based on your business. Same Day
2 Document Collection – You share invoices and required details digitally. 1–2 Days
3 Data Review & ITC Reconciliation – Our experts verify data and reconcile ITC. 1 Day
4 GST Return Preparation – Accurate preparation of GSTR-1 / GSTR-3B / other returns. 1 Day
5 Client Confirmation – Draft shared for approval before filing. Same Day
6 GST Return Filing – Returns filed on the GST portal and acknowledgment shared. Same Day

Estimated Turnaround Time: 2–4 Working Days (per return period)

The GST notice reply process at Finance Saathi is systematic and professional:

Step Process Timeline
1 Notice Review – Our experts analyze the GST notice and identify the issue. Same Day
2 Document Collection – Required invoices, returns, and records are gathered. 1–2 Days
3 Case Analysis – Detailed examination of discrepancies and legal provisions. 1 Day
4 Drafting Reply – Professional response prepared with supporting documents. 1 Day
5 Client Approval – Reply shared with client for confirmation. Same Day
6 Submission on GST Portal – Final reply submitted before deadline. Same Day

Estimated Resolution Time: 2–4 Working Days

The GST amendment process at Finance Saathi is simple, transparent, and fully online:

Step Process Timeline
1 Consultation – Our experts understand the amendment requirement. Same Day
2 Document Collection – You share required documents digitally. 1 Day
3 Application Preparation – Amendment application prepared on GST portal. 1 Day
4 Filing GST Amendment – Submission of Form GST REG-14 online. Same Day
5 GST Officer Review – Approval required for certain amendments. 2–3 Days
6 Updated GST Certificate Issued – Amendment approved and updated in GST records.

Estimated Total Duration: 2–4 Working Days

The GST revocation process at Finance Saathi is simple and fully online:

Step Process Timeline
1 Case Review – Our experts analyze the cancellation order and eligibility for revocation. Same Day
2 Compliance Check – Verification of pending returns and tax liabilities. 1 Day
3 Document Preparation – Preparing explanation and supporting documents. 1 Day
4 Revocation Application Filing – Submission of Form GST REG-21 on the GST portal. 1 Day
5 GST Officer Review – Department reviews the application and may request clarification. 2–3 Days
6 GSTIN Reactivation – GST registration restored after approval.

Estimated Total Duration: 3–7 Working Days

The IEC registration process at Finance Saathi is simple and fully online:

Step Process Timeline
1 Consultation – Our experts understand your import/export business requirements. Same Day
2 Document Collection – Required documents and business details collected. Same Day
3 Application Preparation – IEC registration application prepared on DGFT portal. 1 Day
4 Online Submission – Application filed on the DGFT website. Same Day
5 Verification & Processing – DGFT verifies application details. 1–2 Days
6 IEC Certificate Issued – Import Export Code generated and delivered via email.

Estimated Total Duration: 1–3 Working Days

The Income Tax notice handling process at Finance Saathi is systematic and fully online:

Step Process Timeline
1 Notice Review – Our experts analyze the notice issued by the Income Tax Department. Same Day
2 Document Collection – Required financial records and tax documents collected. 1–2 Days
3 Case Analysis – Detailed evaluation of discrepancies and legal provisions. 1 Day
4 Reply Drafting – Professional response prepared with supporting documents. 1 Day
5 Client Confirmation – Draft reply shared for approval. Same Day
6 Submission on Income Tax Portal – Final reply submitted before the deadline. Same Day

Estimated Total Duration: 2–4 Working Days

The ICEGATE registration process at Finance Saathi is simple and completely online:

Step Process Timeline
1 Consultation – Our experts verify IEC and business details. Same Day
2 Document Collection – Required documents collected digitally. Same Day
3 Application Preparation – ICEGATE registration application prepared. 1 Day
4 Online Submission – Application submitted on ICEGATE portal. Same Day
5 Verification – Customs system verifies submitted details. 1–2 Days
6 ICEGATE Account Activation – Login credentials activated for portal access.

Estimated Total Duration: 1–3 Working Days

Services

The GST revocation process at Finance Saathi is simple and fully online:

Step Process Timeline
1 Case Review – Our experts analyze the cancellation order and eligibility for revocation. Same Day
2 Compliance Check – Verification of pending returns and tax liabilities. 1 Day
3 Document Preparation – Preparing explanation and supporting documents. 1 Day
4 Revocation Application Filing – Submission of Form GST REG-21 on the GST portal. 1 Day
5 GST Officer Review – Department reviews the application and may request clarification. 2–3 Days
6 GSTIN Reactivation – GST registration restored after approval.

Estimated Total Duration: 3–7 Working Days

The business tax filing process at Finance Saathi is simple and fully online:

Step Process Timeline
1 Consultation – Our experts understand your business structure and tax requirements. Same Day
2 Document Collection – Financial records and tax documents collected. 1–2 Days
3 Financial Review – Analysis of income, expenses, and deductions. 1 Day
4 Tax Calculation & Return Preparation – Accurate computation and preparation of ITR form. 1 Day
5 Client Approval – Draft return shared with client for confirmation. Same Day
6 Return Filing – Business tax return filed on the Income Tax portal and acknowledgment shared. Same Day

Estimated Total Duration: 2–4 Working Days

The GST return filing process at Finance Saathi is simple, structured, and fully online:

Step Process Timeline
1 Consultation & Return Type Identification – We identify applicable returns based on your business. Same Day
2 Document Collection – You share invoices and required details digitally. 1–2 Days
3 Data Review & ITC Reconciliation – Our experts verify data and reconcile ITC. 1 Day
4 GST Return Preparation – Accurate preparation of GSTR-1 / GSTR-3B / other returns. 1 Day
5 Client Confirmation – Draft shared for approval before filing. Same Day
6 GST Return Filing – Returns filed on the GST portal and acknowledgment shared. Same Day

Estimated Turnaround Time: 2–4 Working Days (per return period)

The Udyam registration process at Finance Saathi is quick and completely online:

Step Process Timeline
1 Consultation – Our experts understand your business details and eligibility. Same Day
2 Document Collection – Required business and identity details collected. Same Day
3 Application Preparation – MSME registration application prepared on Udyam portal. Same Day
4 Online Submission – Application submitted on the official Udyam registration portal. Same Day
5 Verification & Processing – Government system verifies Aadhaar and PAN details. Same Day
6 Udyam Certificate Issued – MSME registration certificate generated and shared. Within 1–2 Days

Estimated Total Duration: 1–2 Working Days

The Income Tax notice handling process at Finance Saathi is systematic and fully online:

Step Process Timeline
1 Notice Review – Our experts analyze the notice issued by the Income Tax Department. Same Day
2 Document Collection – Required financial records and tax documents collected. 1–2 Days
3 Case Analysis – Detailed evaluation of discrepancies and legal provisions. 1 Day
4 Reply Drafting – Professional response prepared with supporting documents. 1 Day
5 Client Confirmation – Draft reply shared for approval. Same Day
6 Submission on Income Tax Portal – Final reply submitted before the deadline. Same Day

Estimated Total Duration: 2–4 Working Days

The GST notice reply process at Finance Saathi is systematic and professional:

Step Process Timeline
1 Notice Review – Our experts analyze the GST notice and identify the issue. Same Day
2 Document Collection – Required invoices, returns, and records are gathered. 1–2 Days
3 Case Analysis – Detailed examination of discrepancies and legal provisions. 1 Day
4 Drafting Reply – Professional response prepared with supporting documents. 1 Day
5 Client Approval – Reply shared with client for confirmation. Same Day
6 Submission on GST Portal – Final reply submitted before deadline. Same Day

Estimated Resolution Time: 2–4 Working Days

The GST registration process at FinanceSaathi is quick, transparent, and end-to-end online:

Step Process Timeline
1 Consultation & Eligibility Check – Our experts assess your business and required documents. 1 Day
2 Document Collection & Preparation – You share scanned copies; we prepare the application. 1–2 Days
3 Online Application Submission – Filing GST REG-01 on GST portal. 1 Day
4 ARN Generation & Verification – Acknowledgment number generated and verified. 1 Day
5 GST Officer Review – Department may seek clarification if required. 2–3 Days
6 GSTIN Allotment & Certificate Issued – Once approved, you receive your GST registration certificate via email. 3–5 Days Total

Estimated Total Duration: 3–5 Working Days

The IEC registration process at Finance Saathi is simple and fully online:

Step Process Timeline
1 Consultation – Our experts understand your import/export business requirements. Same Day
2 Document Collection – Required documents and business details collected. Same Day
3 Application Preparation – IEC registration application prepared on DGFT portal. 1 Day
4 Online Submission – Application filed on the DGFT website. Same Day
5 Verification & Processing – DGFT verifies application details. 1–2 Days
6 IEC Certificate Issued – Import Export Code generated and delivered via email.

Estimated Total Duration: 1–3 Working Days

The GST amendment process at Finance Saathi is simple, transparent, and fully online:

Step Process Timeline
1 Consultation – Our experts understand the amendment requirement. Same Day
2 Document Collection – You share required documents digitally. 1 Day
3 Application Preparation – Amendment application prepared on GST portal. 1 Day
4 Filing GST Amendment – Submission of Form GST REG-14 online. Same Day
5 GST Officer Review – Approval required for certain amendments. 2–3 Days
6 Updated GST Certificate Issued – Amendment approved and updated in GST records.

Estimated Total Duration: 2–4 Working Days

The GST return filing process at Finance Saathi is simple, structured, and fully online:

Step Process Timeline
1 Consultation & Return Type Identification – We identify applicable returns based on your business. Same Day
2 Document Collection – You share invoices and required details digitally. 1–2 Days
3 Data Review & ITC Reconciliation – Our experts verify data and reconcile ITC. 1 Day
4 GST Return Preparation – Accurate preparation of GSTR-1 / GSTR-3B / other returns. 1 Day
5 Client Confirmation – Draft shared for approval before filing. Same Day
6 GST Return Filing – Returns filed on the GST portal and acknowledgment shared. Same Day

Estimated Turnaround Time: 2–4 Working Days (per return period)

The ICEGATE registration process at Finance Saathi is simple and completely online:

Step Process Timeline
1 Consultation – Our experts verify IEC and business details. Same Day
2 Document Collection – Required documents collected digitally. Same Day
3 Application Preparation – ICEGATE registration application prepared. 1 Day
4 Online Submission – Application submitted on ICEGATE portal. Same Day
5 Verification – Customs system verifies submitted details. 1–2 Days
6 ICEGATE Account Activation – Login credentials activated for portal access.

Estimated Total Duration: 1–3 Working Days

The Income Tax Return filing process at Finance Saathi is simple and completely online:

Step Process Timeline
1 Consultation – Our experts understand your income sources and tax requirements. Same Day
2 Document Collection – Required documents and income details collected. Same Day
3 Tax Calculation – Accurate computation of income, deductions, and tax liability. 1 Day
4 ITR Preparation – Preparation of the appropriate ITR form. 1 Day
5 Client Approval – Return shared with client for confirmation. Same Day
6 ITR Filing & Acknowledgment – Return filed on Income Tax portal and acknowledgment shared. Same Day

Estimated Total Duration: 1–2 Working Days

onlyfans leakedonlyfan leaksonlyfans leaked videos